AUTOMATIC BOILERS

HOTLINE 800 700 068
Virtual tour

Total products: {{ produktyCelkem }}

Show all

Total categories: {{ kategorieCelkem }}

Show all

Total articles: {{ clankyCelkem }}

Show all

The George Inn

Datum realizace: 25. 05. 2015
Power: 30kw and more (large houses and objects)

This KP62S was fitted to The George at Hubberholme, a most traditional and historical country Inn situated in the heart of the Yorkshire Dales National Park. A complex installation, making full use of the potential of the Line 3 range of boilers, designed by Ashburn and installed by our local partner installer Gary from http://www.skiptonstovesandranges.co.uk/ comprising three mixed heating circuits and two hot water circuits. Gary has successfully completed a comprehensive Ponast training course at Ashburn’s Ponast and Verner training centre in Earby, Lancashire. This installation has resulted in this most atmospheric Inn and accommodation having a fantastic ambiance only a system such as this can provide.